UTest Automatic Proctor Hammer (UTS-0660-N) - Operation Procedures
1. Open doors 2. Select mould for testing – 4” or 6” – assemble mould and tighten wing nuts. 3. Rotate piston catch arm to block downward piston travel. 4. Make sure correct piston is installed for selected mould: • 4” mould for Standard Proctor use ...